Why it is a separate MicroERP
A client/contractor quality team can verify delivered work using project references without running tendering or workforce planning.
Controlled inspection acceptance and closed handover/defect obligations
Who it helpsSite quality/inspection and handover team
A work package requiring verification or a handover obligation
Confirm inspection/method readiness
capture tests/hold-point decisions
resolve punch defects
compile accepted as-built/handover evidence
track defects-liability closure
Controlled inspection acceptance and closed handover/defect obligations
Open each module to review its purpose and actions. These features belong inside Construction Quality & Handover MicroERP.
Assemble the records required to transfer completed works.
Manage workmanship defects during the agreed post-completion period.
Verify work before it is covered or the next stage begins.
Link material test evidence to installed work.
Coordinate expert-approved method and inspection prerequisites.
Close defects identified before or after handover.
A client/contractor quality team can verify delivered work using project references without running tendering or workforce planning.
Industry compositions select relevant products and modules. Some options apply only under particular operating conditions; review the industry page before choosing.
Confirm your workflows, required integrations, team access, migration and acceptance checks in one implementation brief.