Solar Installation Management MicroERP

Commissioned accepted installation and technical handover

Who it helpsSolar coordinator with qualified reviewers

FROM A REAL REQUEST TO A USEFUL RESULT

The working flow.

Installation/expansion enquiry

  1. 01

    Survey/load/shading

  2. 02

    qualified design/options

  3. 03

    accepted proposal

  4. 04

    permits/material readiness

  5. 05

    authorized installation/checks

  6. 06

    commissioning/as-built/customer/service handover

The useful outcome

Commissioned accepted installation and technical handover

ALL FEATURES IN THEIR OWNING PRODUCT

32 feature modules.
One product scope.

Open each module to review its purpose and actions. These features belong inside Solar Installation Management MicroERP.

01Roof & Structural Suitability Review3 scoped actions

Coordinate the qualified assessment of mounting-location suitability.

  • Roof condition and load evidence
  • Professional findings and approved constraints
  • Required remedial work and release record
02Solar Milestone Acceptance & Charges3 scoped actions

Release specialized project charges only on the agreed evidence.

  • Deposit installation and commissioning milestones
  • Customer acceptance and retention conditions
  • Approved variations and final charge handoff
03Solar Permission & Approval Tracking3 scoped actions

Coordinate project-specific applications identified by qualified local review.

  • Applicable authority and current requirement source
  • Submission evidence and status
  • Conditions clarification and approval expiry
04Solar As-Built & Installed Asset Register3 scoped actions

Keep the delivered system traceable to its final configuration.

  • Installed layout and drawing revisions
  • Panel inverter and storage serial mapping
  • Final documents and component warranty references
05Solar Design BOM3 scoped actions

Translate the approved system design into controlled material requirements.

  • Design-linked component quantities
  • Approved substitutes and version changes
  • Procurement and installation quantity comparison
06Solar Commissioning Control3 scoped actions

Coordinate authorized activation of a completed system.

  • Prerequisite approvals and test completion
  • Commissioning event and operating checks
  • Unresolved issue and release decision
07Solar Component Compatibility Review3 scoped actions

Prevent unapproved component substitutions from reaching installation.

  • Datasheet and approved pairing references
  • Proposed substitution technical review
  • Accepted alternative and affected drawing update
08Solar Contract & Delivery Baseline3 scoped actions

Align the sold system with deliverables milestones and responsibilities.

  • Approved system and scope baseline
  • Customer and installer obligations
  • Completion criteria and variation rules
09Solar Technical Design Review3 scoped actions

Authorize a consistent design before buying or installing the system.

  • Survey layout electrical and BOM cross-check
  • Reviewer findings and resolution
  • Released design version and change authority
10Solar Electrical Design Package3 scoped actions

Maintain the qualified electrical design and component requirements.

  • Single-line and circuit design references
  • Protection earthing and cable specifications
  • Professional approval and revision history
11Solar Finance & Incentive Assistance3 scoped actions

Track customer-approved financing or incentive applications without guaranteeing eligibility.

  • Provider scheme and current-source reference
  • Required evidence and submission milestones
  • Approval disbursement and rejected-case follow-up
12Grid Connection & Metering Coordination3 scoped actions

Track the external connection process for a grid-connected installation.

  • Utility application and technical references
  • Inspection metering and approval milestones
  • Rejected or delayed application follow-up
13Solar Installation Work Packs3 scoped actions

Guide and record installation against the released design.

  • Assigned installation steps and drawings
  • Actual component placement and work evidence
  • Deviation hold and authorized instruction
14Solar Array & Mounting Layout3 scoped actions

Control the installation layout approved for the actual site.

  • Panel orientation and mounting arrangement
  • Access and exclusion constraints
  • Reviewed drawing revision and field deviation
15Solar Project Qualification3 scoped actions

Confirm that a prospective installation has a defined customer need and feasible next step.

  • Site ownership and decision contacts
  • Demand budget and installation objectives
  • Survey prerequisites and go-or-defer decision
16Site Energy & Load Profile3 scoped actions

Establish the energy-demand basis used by the technical designer.

  • Historical bills and interval-data references
  • Operating hours and major-load assumptions
  • Baseline completeness and customer validation
17Solar Site Material Kitting3 scoped actions

Deliver a complete design-matched installation kit to the site.

  • Released BOM and site allocation
  • Kit completeness and shortage resolution
  • Site receipt surplus and return reconciliation
18Solar Owner Training & Instructions3 scoped actions

Record the customer's operational handover for the installed system.

  • Approved operating and emergency-contact materials
  • Training attendance and questions
  • Acknowledged responsibilities and support route
19Solar Progress & Installed Quantities3 scoped actions

Measure actual installation progress against the project baseline.

  • Completed quantities and milestone evidence
  • Material labour and delay attribution
  • Forecast completion and progress exception review
20Solar Installation Schedule3 scoped actions

Sequence the project around readiness procurement and installation dependencies.

  • Milestone and task dependencies
  • Crew material and access windows
  • Delay recovery and customer date updates
21Solar Proposal & Option Approval3 scoped actions

Obtain customer acceptance of a clearly specified system and price.

  • System scope assumptions and exclusions
  • Option price warranty and delivery terms
  • Accepted proposal version and expiry
22Solar Snag & Punch List3 scoped actions

Close unfinished or defective installation items with evidence.

  • Item location severity and owner
  • Corrective visit and revised completion date
  • Customer or technical acceptance of closure
23Solar Installation Quality Hold Points3 scoped actions

Resolve required inspection findings before dependent work proceeds.

  • Stage-specific approved inspection checklists
  • Defects evidence and responsible owner
  • Reinspection and hold-point release
24Solar Service Team Handover3 scoped actions

Transfer installation knowledge and obligations to the support owner.

  • System history warranty and unresolved items
  • Customer support contacts and service dates
  • Support acceptance and operational ownership
25Solar Shading & Site Model3 scoped actions

Maintain the geometry and obstruction model behind a solar proposal.

  • Roof terrain and obstruction model
  • Shading assumptions and measurement provenance
  • Model version and review corrections
26Solar Site Readiness Gate3 scoped actions

Verify that the site can receive and support the planned installation.

  • Access storage and enabling-work checks
  • Customer prerequisites and outstanding constraints
  • Ready-to-start approval or hold reason
27Solar Site Survey3 scoped actions

Capture site conditions needed for an approved installation design.

  • Dimensions photos and obstruction evidence
  • Electrical access and connection information
  • Survey gaps and professional follow-up
28Solar Battery Storage Delivery3 scoped actions

Add storage-specific installation and handover controls when batteries are supplied.

  • Approved battery configuration and location
  • Qualified installation commissioning and settings evidence
  • Operating instructions warranty and monitoring handover
29Solar System Sizing Options3 scoped actions

Compare professionally reviewed configurations against the customer's need.

  • PV inverter and optional storage options
  • Capacity and compatibility constraints
  • Selected option and design assumptions
30Solar Test & Verification Records3 scoped actions

Preserve qualified test evidence without prescribing technical thresholds.

  • Approved test procedure and instrument reference
  • Recorded results and reviewer assessment
  • Failed-test correction and retest linkage
31Solar Work Authorization & Controls3 scoped actions

Record competent authorization for the planned site work.

  • Activity-specific hazard and control record
  • Isolation access and personnel prerequisites
  • Start stop and resume authorization evidence
32Solar Yield & Savings Estimate3 scoped actions

Present transparent estimates with their underlying assumptions.

  • Weather shading and system input references
  • Yield tariff and degradation assumptions
  • Scenario comparison and customer-facing qualifications
CLEAR OWNERSHIP. CONNECTED FUNCTIONS.

How the scope fits together.

Why it is a separate MicroERP

A contractor can independently operate design-to-commissioning delivery; it does not require all recurring monitoring/energy-service functions.

Dependencies to plan

  • Shared identity, party/reference, authorization, approval, evidence and provider adapter primitives are reused.
  • A dependency or external data import does not disqualify independent use.
  • Shared project/procurement/stock/field engines; qualified design/authority reviews

Outside this scope

  • Individual fields, calculations, review steps and reports remain internal modules.
  • Source industry applicability, permissions and qualified-review requirements are retained.
  • No duplicate physical-stock ledger or generic scheduling engine.
REUSE THE SAME PRODUCT

Mapped to your industry.

Industry compositions select relevant products and modules. Some options apply only under particular operating conditions; review the industry page before choosing.

Start with this scope.

Confirm your workflows, required integrations, team access, migration and acceptance checks in one implementation brief.