Construction ManagementReviewed functional scope

Construction Project Delivery MicroERP

Traceable construction execution and project delivery record

Who it helpsConstruction project/site manager

FROM A REAL REQUEST TO A USEFUL RESULT

The working flow.

Accepted construction scope/tender

  1. 01

    Plan BOQ/work packages

  2. 02

    establish site readiness/drawings/submittals

  3. 03

    mobilize crew/material/plant/subcontracts

  4. 04

    record measured site progress/constraints

  5. 05

    deliver accepted project handover

The useful outcome

Traceable construction execution and project delivery record

ALL FEATURES IN THEIR OWNING PRODUCT

16 feature modules.
One product scope.

Open each module to review its purpose and actions. These features belong inside Construction Project Delivery MicroERP.

01Site BIM & Model Coordination3 scoped actions

Use approved models to coordinate construction interfaces.

  • Link model issues to work locations
  • Review clashes and responsibility
  • Track resolved models and field changes
02Site Constraint & Obstruction Desk3 scoped actions

Resolve access, design and supply constraints that block work.

  • Record affected location and activity
  • Assign removal action and required date
  • Track delay evidence and downstream effect
03Construction Drawing Revision Control3 scoped actions

Ensure site teams use the correct approved drawings.

  • Publish drawings by discipline and location
  • Supersede obsolete revisions
  • Track acknowledgment and affected work
04Crew Output & Productivity3 scoped actions

Review labor deployment against measured construction output.

  • Record crew allocation and productive hours
  • Compare output with planned norms
  • Investigate idle time and rework causes
05Construction Plant Allocation3 scoped actions

Coordinate equipment availability and cost across site activities.

  • Reserve equipment for work packages
  • Track operating and idle hours
  • Reconcile hire, fuel and mobilization charges
06Requests for Information3 scoped actions

Resolve unclear design or scope before affected work proceeds.

  • Raise question with drawing references
  • Route to authorized designer or client
  • Record response and cost or schedule impact
07Site Safety Observations & Actions3 scoped actions

Track observations and corrective actions within the approved safety system.

  • Record observed hazard and immediate escalation
  • Assign corrective action and responsible person
  • Verify closure without replacing specialist judgment
08Site Daily Progress Diary3 scoped actions

Preserve an accountable daily record of site activity.

  • Record work, resources and conditions
  • Attach photographs and obstruction notes
  • Obtain daily review and carry-forward actions
09Site Material Requests & Consumption3 scoped actions

Reconcile project materials from request to installed or unused balance.

  • Request quantities against work packages
  • Track receipt, issue and site transfers
  • Compare consumption with installed quantities
10Site Mobilization Readiness3 scoped actions

Prepare the site and delivery resources before work starts.

  • Track access, utilities and setup tasks
  • Confirm required permits and customer handover
  • Release mobilization after accountable review
11Subcontract Work Packages3 scoped actions

Delegate defined construction work with measurable obligations.

  • Issue package scope and rates
  • Track site readiness and subcontract progress
  • Manage package changes and performance issues
12Material & Technical Submittals3 scoped actions

Obtain approval of proposed materials and technical details.

  • Prepare submittal packages and samples
  • Track review cycles and decisions
  • Release approved selections to purchasing or installation
13Tender & Bill-of-Quantities Estimating3 scoped actions

Price measured construction scope with traceable rate assumptions.

  • Import or build BOQ quantities
  • Assemble labor, material and plant rates
  • Compare tender revisions and exclusions
14Construction Work Packages & Schedule3 scoped actions

Sequence measurable site work and dependencies.

  • Define locations and work packages
  • Baseline activity quantities and dates
  • Record progress and recovery plans
15Weather & Delay Evidence3 scoped actions

Preserve contemporaneous evidence for interrupted construction work.

  • Record conditions and affected activities
  • Separate planned from actual delay
  • Link evidence to reviewed extension requests
16Site Work Permit Coordination3 scoped actions

Manage authorization records for controlled site activities.

  • Capture required permit and competent approvers
  • Check validity and affected work area
  • Close or suspend authorization when conditions change
CLEAR OWNERSHIP. CONNECTED FUNCTIONS.

How the scope fits together.

Why it is a separate MicroERP

A contractor needs a complete site-delivery product; commercial valuation and independent QA can connect through interfaces.

Outside this scope

  • D
  • o
  • e
  • s
  • n
  • o
  • t
  • d
  • u
  • p
  • l
  • i
  • c
  • a
  • t
  • e
  • a
  • c
  • c
  • o
  • u
  • n
  • t
  • i
  • n
  • g
  • p
  • o
  • s
  • t
  • i
  • n
  • g
  • ,
  • p
  • h
  • y
  • s
  • i
  • c
  • a
  • l
  • s
  • t
  • o
  • c
  • k
  • l
  • e
  • d
  • g
  • e
  • r
  • o
  • r
  • p
  • r
  • o
  • f
  • e
  • s
  • s
  • i
  • o
  • n
  • a
  • l
  • c
  • e
  • r
  • t
  • i
  • f
  • i
  • c
  • a
  • t
  • i
  • o
  • n
  • .
REUSE THE SAME PRODUCT

Mapped to your industry.

Industry compositions select relevant products and modules. Some options apply only under particular operating conditions; review the industry page before choosing.

Start with this scope.

Confirm your workflows, required integrations, team access, migration and acceptance checks in one implementation brief.