Skip to content
INDUSTRY SOLUTIONS / HOSPITALITY & FOOD
BetaInteractive sampleSample company: try anything, reset every night

Smarter software for
Hotels & Resorts.

Simplify hospitality workflows. The workflow below shows which apps cover each part of the work, which are open today and which are planned.

3 of 14 apps open today (Beta). There is no public demo yet.

Swimming pool and garden at a tropical resort.
Representative industry photo · Photo by Sara Dubler
YOUR DAILY WORK, CONNECTED

A clearer flow for Hotels & Resorts.

Hospitality administrators, reservation teams and front-desk staff. Use the demo to review the available workspace; industry-specific fields, integrations and rules are agreed during configuration.

01 / WORKFLOW

Record the reservation requirement

Proposed handoff: Reservation records that connect guest requirements to the capacity offered. Agree availability, deposits, amendments and cancellations and who may complete or correct this stage.

02 / WORKFLOW

Review room assignment

Proposed handoff: Room records for the types, assignments and operational statuses in your agreed scope. Agree availability, maintenance blocks and handoff rules and who may complete or correct this stage.

03 / WORKFLOW

Maintain the authorised guest reference

Proposed handoff: Guest records for the contact and stay information your team is authorised to retain. Agree required fields, consent, identity obligations and retention and who may complete or correct this stage.

Keep the important records together

  • Reservation dates and resource references
  • Room references and status records
  • Guest contacts and stay references
  • Workspace roles and permission definitions

Review work before it gets missed

  • Reservation and room review: confirm source records, filters and review responsibilities.
  • Guest administration: confirm source records, filters and review responsibilities.

Choose a manageable starting scope

Industry ERP: The same plan price as any product: one industry ERP, including its MicroERPs open today. Migration and rollout are quoted.See pricing

Start with the apps your team needs first; add industry adaptations, migration and integrations as the scope grows.

How pricing works
ESTIMATE YOUR OWN CASE

What could less manual work be worth?

For your hotels & resorts team, enter a reduction in repeated entry, searching or follow-up time that you think is achievable. The result is a planning illustration, not measured product performance.

5.5 hours/month · $110 estimated time valueAssumptions: 15 minutes × 22 workdays ÷ 60 × $20/hour. Compare it with your plan on the Pricing page, before implementation, infrastructure, other apps, taxes and usage costs. Time value is not guaranteed cash savings or ROI. Validate changes against your own baseline and actual adoption.
INDUSTRY WORKFLOW OPPORTUNITIES

Start with the work.
Build the scope around it.

These 8 scopes are proposals for validation. Shared modules are linked as reusable building blocks, and product readiness remains a separate decision.

PROPOSED WORKFLOW · PRIORITY P1E19-01

Hotel Reservations & Front Desk

Manage room reservations, guest check-in, room assignment and checkout account settlement.

Free for 1 user · paid plans from $7/month

Primary buyer: Hotel general manager / operations manager

Discuss this scope
PROPOSED WORKFLOW · PRIORITY P1E19-02

Housekeeping & Room Readiness

Dispatch room cleaning tasks, inspect readiness, handle exceptions and release rooms for allocation.

Free for 1 user · paid plans from $7/month

Primary buyer: Hotel general manager / operations manager

Discuss this scope
PROPOSED WORKFLOW · PRIORITY P1E19-03

Hotel Maintenance & Engineering Desk

Log maintenance requests, assign technicians, track parts and confirm room or equipment return to service.

Free for 1 user · paid plans from $7/month

Primary buyer: Hotel general manager / operations manager

Discuss this scope
PROPOSED WORKFLOW · PRIORITY P1E19-04

Banquet & Conference Operations

Convert event inquiries into space bookings, resource plans, service orders and milestone payments.

Free for 1 user · paid plans from $7/month

Primary buyer: Hotel general manager / operations manager

Discuss this scope
PROPOSED WORKFLOW · PRIORITY P1E19-06

Guest Service Request Desk

Receive guest requests, route tasks to departments, track response times and confirm completion.

Free for 1 user · paid plans from $7/month

Primary buyer: Hotel general manager / operations manager

Discuss this scope
REVIEWED PRODUCT COMPOSITION

The MicroERPs for Hotels & Resorts.

34 MicroERPs are used in this reference model: 14 industry-specific and 20 shared. Products are reused across industries; include each conditional function only when it fits your operation.

Explore mapped products
Reference operating model

A midmarket hotel with room reservations, reception, housekeeping and guest folio settlement.

Industry-specific MicroERPs 14

Products with direct scope assignments for Hotels & Resorts.

Lodging OperationsComing soonIncludes core scope

Hotel Front Office & Housekeeping MicroERP

Completed accommodation stay and controlled guest account; Verified service readiness and completed housekeeping/laundry custody obligations

For Reservation/front-desk/guest-accounts team; Housekeeping/laundry or accommodation service supervisor

When to include it · 46 scope references
  • Core: Always for the stated reference model.
  • Conditional: When electronic locks are integrated with the PMS.
  • Conditional: When outlet POS charges may be posted to guest folios.
  • Conditional: When group accommodation is sold.
  • Conditional: When concierge arrangements or guest transport are provided.
  • Conditional: When rooms include chargeable minibar products.
  • Conditional: When guest garment laundry is offered.
  • Conditional: When in-room food service is operated.
  • Conditional: When banquets or conferences are hosted.
  • Conditional: When spa, pool or recreation facilities are operated.
  • Conditional: When several properties are managed jointly.
  • Advanced: When metering and occupancy data support utility-efficiency review.
46 feature modules1 mapped industry
Lodging OperationsComing soonIncludes core scope

Accommodation Distribution Management MicroERP

Approved distributed room offers and reconciled channel booking/payment references

For Accommodation distribution / revenue manager

When to include it · 6 scope references
  • Core: Always for the stated reference model.
  • Conditional: When third-party booking channels or channel managers are connected.
  • Conditional: When negotiated corporate accommodation contracts are offered.
  • Advanced: When demand and booking history support human-approved revenue optimization.
6 feature modules1 mapped industry
Procurement & SuppliersComing soonIncludes core scope

Purchasing & Suppliers MicroERP

Fulfilled purchase commitment and controlled receipt/acceptance handover; Approved supplier/counterparty profile with scoped qualification conditions; Closed supplier claim/return/incentive with traceable recovered or disputed value

For Buyer; Supplier quality / onboarding officer; Supplier claims / commercial recovery officer

When to include it · 3 scope references
  • Core: Always for the stated reference model.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
22 feature modules63 mapped industries
InventoryBetaInteractive sampleSample company: try anything, reset every nightIncludes core scope

Stock Control & Counting MicroERP

Controlled count result and approved discrepancy resolution; One authoritative physical-stock ledger and completed custody/fulfilment events

For Stock count coordinator / investigator; Storekeeper / fulfilment supervisor

When to include it · 6 scope references
  • Core: Always for the stated reference model.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When production or assortment is coordinated across outlets.
38 feature modules35 mapped industries
Restaurant OperationsComing soonConditional scope

Restaurant Ordering, Billing & Kitchen MicroERP

Completed food order and controlled commercial charge record; Accepted prepared-food output with recipe/quality/material trace

For Food counter/server / online order operator; Kitchen / food preparation supervisor

When to include it · 47 scope references
  • Conditional: When in-room food service is operated. Also applies when the hotel directly operates the corresponding restaurant workflow, with that workflow's original variant conditions.
  • Conditional: When an on-property dining outlet offers table service; activate the wider restaurant pack as well. Also applies when the hotel directly operates the corresponding restaurant workflow, with that workflow's original variant conditions.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When digital preparation screens are used; KOT routing still supports printer or manual fallback.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When tips or a declared staff service pool are administered.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When customers place orders from a table QR session.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When a separate beverage bar is operated.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When food aggregators are used.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When buffet meals are offered.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When production or assortment is coordinated across outlets.
  • Advanced: When the hotel directly operates a full-service restaurant. Restaurant condition: When historical orders and event demand support reviewed prep forecasts.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When customers order through the operator-owned website or app.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When an ingredient or prepared-food batch is identified for withdrawal or recall; trace affected production and sales before closing the case.
53 feature modules6 mapped industries
Restaurant OperationsComing soonConditional scope

Food Delivery Dispatch MicroERP

Closed food handover/delivery obligation

For Food fulfilment / dispatch coordinator

When to include it · 5 scope references
  • Conditional: When in-room food service is operated. Also applies when the hotel directly operates the corresponding restaurant workflow, with that workflow's original variant conditions.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When takeaway orders are accepted.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When the restaurant manages delivery directly.
5 feature modules5 mapped industries
Restaurant OperationsComing soonConditional scope

Dining Reservation & Seating Management MicroERP

Managed party seating and capacity obligation

For Restaurant host / floor coordinator

When to include it · 9 scope references
  • Conditional: When an on-property dining outlet offers table service; activate the wider restaurant pack as well. Also applies when the hotel directly operates the corresponding restaurant workflow, with that workflow's original variant conditions.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When dining reservations or group events require commitments or advances.
9 feature modules4 mapped industries
Assets & FacilitiesBetaInteractive sampleSample company: try anything, reset every nightConditional scope

Maintenance & Calibration MicroERP

Current calibration status and controlled affected-work action list; Serviced equipment with accountable readiness and future maintenance plan

For Instrument quality / calibration coordinator; Maintenance planner / equipment owner

When to include it · 1 scope references
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
8 feature modules63 mapped industries
InventoryComing soonConditional scope

Product Information MicroERP

Approved, consistent item/variant/compatibility catalogue

For Catalogue / merchandising master-data steward

When to include it · 1 scope references
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
10 feature modules19 mapped industries
InventoryComing soonConditional scope

Inventory Quality & Traceability MicroERP

Traceable quality/handling disposition and affected-stock evidence

For Receiving quality / traceability controller

When to include it · 3 scope references
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
13 feature modules33 mapped industries
Sales & BillingComing soonConditional scope

Point of Sale MicroERP

Completed counter sale and reconciled cashier session

For Cashier / counter supervisor

When to include it · 4 scope references
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: Always for the stated reference model.
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When checkout or kitchen hardware must be connected.
11 feature modules12 mapped industries
Finance & ExpensesComing soonConditional scope

Settlement Reconciliation MicroERP

Explained and reconciled external settlement with unresolved exceptions

For Settlement / treasury reconciliation analyst

When to include it · 1 scope references
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When food aggregators are used.
6 feature modules63 mapped industries
CRM & CustomersBetaInteractive sampleSample company: try anything, reset every nightConditional scope

Loyalty & Gift Cards MicroERP

Auditable reward or gift-value balance and redemption history

For Retail loyalty / stored-value administrator

When to include it · 2 scope references
  • Conditional: When the hotel directly operates a full-service restaurant. Restaurant condition: When loyalty or stored gift value is offered.
2 feature modules9 mapped industries

Shared MicroERPs 20

Common products reused across industries. They are not automatically required, enabled or implemented for every business.

Sales & BillingBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Quotes & Orders MicroERP

Accepted versioned quotation with traceable exclusions and price assumptions; Controlled customer-order commitment and reconciled fulfilment balance

For Estimator / sales approver; Order desk / trade-sales coordinator

When to include it · 1 scope references
  • Conditional: Prices or scope are agreed before an order, job or engagement
29 feature modules63 mapped industries
Legal & ContractsBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Contract Management MicroERP

Controlled agreement and obligation/renewal record

For Contract owner / commercial or legal reviewer

When to include it · 1 scope references
  • Conditional: Recurring, negotiated or legally documented customer and supplier engagements
2 feature modules63 mapped industries
Sales & BillingComing soonConditional shared scope

Invoicing & Credit Notes MicroERP

Controlled issued invoice or credit-note record with tax/reference evidence

For Billing clerk / invoice approver

When to include it · 5 scope references
  • Conditional: The business issues invoices for goods, services or billable events
  • Conditional: Sales corrections, returns, overpayments or cancellations are permitted
  • Conditional: Advance collections, refundable deposits or retained balances are used
  • Conditional: Indian GST invoice rules apply to the organization's transactions
  • Conditional: The organization's applicable rules require or permit IRP e-invoicing
6 feature modules63 mapped industries
Finance & ExpensesBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Payables & Receivables MicroERP

Validated supplier payable and accountable payment-run result; Reconciled customer balances and accountable collection commitments

For Payables clerk / payment approver; Credit controller / receivables clerk

When to include it · 5 scope references
  • Core: Every reference business receiving money
  • Conditional: Customers, sponsors, tenants or partners pay after billing
  • Conditional: The business allows credit sales or deferred settlement
  • Conditional: The business receives supplier or subcontractor invoices
  • Conditional: The business pays supplier obligations
5 feature modules63 mapped industries
Finance & ExpensesBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Expense Management MicroERP

Approved reimbursed expenses and reconciled petty-cash position

For Employee / expense reviewer / cashier

When to include it · 2 scope references
  • Conditional: Employees or representatives incur recoverable business expenses
  • Conditional: Branches or staff operate cash floats
2 feature modules63 mapped industries
Finance & ExpensesBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Financial Accounting MicroERP

Auditable balanced ledger and controlled financial close

For Accountant / period-close controller

When to include it · 2 scope references
  • Core: The ERP owns bookkeeping or produces controlled postings for an accounting system
  • Core: The ERP owns bookkeeping or supports an external close process
2 feature modules63 mapped industries
Finance & ExpensesComing soonConditional shared scope

Tax Compliance Workpapers MicroERP

Reviewable tax-period workpack and reconciliation/statement evidence

For Tax preparer and authorized reviewer

When to include it · 5 scope references
  • Conditional: Applicable taxes or statutory reporting need structured records
  • Conditional: The organization has Indian tax registrations or multiple registered locations
  • Conditional: The organization reconciles purchase records with its GST input-credit statement
  • Conditional: Indian GST reporting is handled internally or prepared for an accountant
  • Conditional: Applicable withholding or collection-at-source rules cover the organization's transactions
5 feature modules63 mapped industries
Finance & ExpensesBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Budget & Cash Flow Planning MicroERP

Approved budget variance and forward cash plan

For Budget owner / finance planner

When to include it · 2 scope references
  • Advanced: Management requires departmental, location or programme spending controls
  • Advanced: Payment timing or working-capital planning materially affects operations
2 feature modules63 mapped industries
HR & WorkforceComing soonConditional shared scope

Employee Management MicroERP

Accountable employee record and completed handover

For HR administrator

When to include it · 4 scope references
  • Conditional: The business employs staff or retains accountable internal workers
  • Conditional: The business employs staff or provisions accountable workers
  • Conditional: Work requires qualifications, inductions or recurring internal training
  • Conditional: Pay revisions, allowances or employee benefit plans are administered
4 feature modules63 mapped industries
HR & WorkforceComing soonConditional shared scope

Attendance & Leave MicroERP

Approved time/absence period

For Workforce administrator / shift manager

When to include it · 4 scope references
  • Conditional: Paid work time or attendance must be recorded
  • Conditional: The business administers employee leave or absence
  • Conditional: The organization schedules shifts or variable work patterns
  • Conditional: Overtime or time-off-in-lieu is part of approved employment policy
4 feature modules63 mapped industries
HR & WorkforceBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Payroll MicroERP

Approved pay run and controlled payment handoff

For Payroll administrator / approver

When to include it · 6 scope references
  • Conditional: Employee pay is computed internally or prepared for a payroll provider
  • Conditional: The employer and employees fall within the applicable EPF operating scope
  • Conditional: The employer and employees fall within the applicable ESI operating scope
  • Conditional: Professional tax, labour welfare or other local payroll rules apply
  • Conditional: The employer offers recoverable employee loans or salary advances
  • Conditional: Employment exits require financial settlement
6 feature modules63 mapped industries
Assets & FacilitiesBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Fixed Asset Management MicroERP

Accountable asset register and approved lifecycle/depreciation events

For Asset accountant / custodian

When to include it · 1 scope references
  • Conditional: The business owns assets requiring custody or accounting control
1 feature module63 mapped industries
Documents & ApprovalsBetaInteractive sampleSample company: try anything, reset every nightConditional shared scope

Document Control MicroERP

Controlled approved document and retrievable version/retention history

For Document controller / record owner

When to include it · 1 scope references
  • Core: Every reference business keeping operating records
1 feature module63 mapped industries

These are reviewed product scopes. Existing sample workspaces demonstrate only their currently implemented functions. Confirm product delivery, integrations and configuration separately.

PLANNED OFFLINE FEATURES

Keep working. Reconnect within 48 hours.

After initial online setup, use configured core workflows and locally available data on your device offline. Reconnect and verify your system to sync saved changes.

Planned for upcoming Micro-ERP releases. Availability and implementation must be confirmed in your final proposal.

Work offline

After initial online setup, keep using configured core workflows and available data on your device. Save changes locally during an internet interruption, within the 48-hour verification window.

Reconnect. Verify. Sync.

After successful online service verification, pending local changes sync with your configured system and agreed destinations. Any conflicts stay visible for review.

A 48-hour verification lock

Your system must verify with the authorized service within 48 hours of its last successful verification. Internet access alone does not renew the window. At the deadline, ERP use locks until verification succeeds; pending local changes remain saved.

Your drive. Your database.

Use a supported connector for files or exports on your own drive, or structured records in your own database. You control the destination and permissions; scope and sync direction are agreed in your proposal.

You pay your chosen drive/database provider. Any EasyManageX-hosted copies follow your cloud storage allowance and usage charges.

AI, SMS, WhatsApp and other internet-dependent services wait until connected.

The same offline verification policy applies to shared-server and dedicated-server hosted plans, with monthly or lifetime licences, and to self-managed software purchases.

PLANNED INTELLISTRA AI

Intellistra AI, inside your Micro-ERP.

Plan AI assistance, clearer reports and reviewed automation around your business, with a custom workflow design capability shaped for your team.

Planned for upcoming Micro-ERP releases. Intellistra currently presents private-beta prototypes; included capabilities and supported integrations need final proposal confirmation.

Ask in context

Plan an assistant that answers business questions using approved, configured ERP context. Access stays within the records and permissions agreed for your build.

Reports that make sense

Explore management summaries, receivables insights and purchase-approval context from supported read-only records. Reporting coverage is confirmed for your integration.

Automation with approval

Plan supported tasks and follow-up workflows with review, permissions and approval steps. Record-changing actions need a validated implementation before they become available.

Design your workflow

A planned EasyManageX capability to shape custom steps, roles, rules and approvals around your process. Your final proposal defines the designer and supported execution scope.

Review each connection

Use reviewed Assistant and AutoConnect concepts to plan connections and field mappings. Connector availability, schema and approved access are agreed before integration.

Stay in control

Plan identity, scoped permissions, approval checkpoints and audit history for AI-assisted work. You review the authorized actions and boundaries for your workspace.

AI runs on usage credits. Rates, credit rules and included capabilities are confirmed in your proposal.

Intellistra AI needs internet access; AI requests wait while your Micro-ERP is offline.

Approved context, supported connections and explicit permissions define what AI can access or do. Actions that change records require a validated implementation and the agreed approvals.

RESEARCH THIS WORKFLOW

Useful guides before the next decision.

Explore the complete knowledge hub →